CASE STUDY

Belden Wire and Cable

Build-to-suit/Own

250,000-square-foot regional manufacturing/distribution facility

Lancaster, SC

Belden Wire and Cable

Belden Wire and Cable needed a facility to be completed under a fixed budget, however along with that budget came a big obstacle. Their initial site selection inflated site development costs, and therefore exceeded that budget.

  • An alternate site was identified which resulted in a reduction of overall costs.
  • As a result of the new site, additional state and local incentives were negotiated for Belden Wire and Cable.

In the end, all the client’s goals were achieved— at 15% less than budgeted.

The project was developed or constructed by principals of Red Rock Developments prior to founding the company.