CASE STUDY

Build-to-Suit/Own
250,000 square-foot regional manufacturing/distribution facility
Lancaster, SC

Belden Wire and Cable needed a facility to be completed under a fixed budget, however along with that budget came a big obstacle. Their initial site selection inflated site development costs, and therefore exceeded that budget.

An alternate site was identified which resulted in a reduction of overall costs. As a result of the new site, additional state and local incentives were negotiated for Belden Wire and Cable. In the end, all the client’s goals were achieved— at 15% less than budgeted.

The project was developed or constructed by principals of Red Rock Developments prior to founding the company.

 

>> Download case study